The management system about concrete mixer equipment

Time:2015-12-25

The management system about concrete mixer equipment
the management,use, maintenance of concrete mixer should be done with institutionalization, standardization,and according to the current implementation of the relevant provisions of the State to establish rules and regulations, such as; facilities management, security regulations, procedures, job responsibilities and test equipment system regularly.
2, there should be a full-time professional equipment management and maintenance personnel, responsible for managing the entire process of production machinery and equipment, testing maintenance work, the establishment of machinery and equipment accounting, prepare for repairing and maintenance plans and maintenance records.
3, Inspect the mainly machinery and equipment (mixing truck, pumping vehicles) to ensure the project with a normal rate, should be maintenance regularly, repair or replacement the parts and make records.
4, the operator should have professional training certificates (mixing, pumping staff).
5, concrete mixing equipment should be kept clean in good condition, ensure the cleaning of control system instrumentation, electronic sensors, mechanical lever actuator.
6, Establishing the safety inspection system to achieve safe and civilized production, maintain mechanical equipment, keep vehicle itself clean. 

share:
Pre:Reuse, recycling is the necessary for domestic concrete industry
Next:Which problems should notice about construction engineering homework in concrete mixer?