Debugging requires about concrete batching plant equipment

Time:2016-01-04

Debugging requires about concrete batching plant equipment
It is must be adjusted accordingly after the end of the installation,to ensure that the concrete batching plant without any failure and the various systems are in normal operation, so it can be very good in the production process, and incidence of failure are effectively reduced.
In the debugging process, first, reset the emergency button, turn off the power to open an enclosed cabinet, after the connection, open the slide circuit breaker, control the circuit of the power switch, and observe the electrical system and then confirm the normality, check the correctness of motor,if not correct, it should be adjusted immediately.
Start concrete batching plant pump, when pressure meet the requirements, press the button again exhaled air control doors, inspecting the operations is flexible on the computer to adjust the zero and sensitivity adjustment, check the air pressure is normal, the pressure display table is switch correctly, the pressure relief valve is adjusted to within the standard range.
Concrete mixer for debugging, to see whether there will be a different abnormal sound, all components can work, belt conveyor in the debugging process, it needs to run, and check all running flexible support rollers during operation, observe the belt carefully , to ensure dosed button to check that it is flexible and can be precisely configured.After the commissioning, it can be used as the reference. 

share:
Pre:How to complete the concrete mixer cleaning quickly ?
Next:Signal problems concrete mixer’s mixing drum